More dates

Payment plans available!

How payment plans work

  • Your order will be reserved but sent to you only after the full payment plan has been completed.
  • A minimum upfront payment is required to secure your order. This includes a surcharge, a non-refundable cancellation fee, and a refundable deposit.
  • You’ll receive a notification before each payment attempt. You must ensure sufficient funds are available.

Stormwater SA Breakout Creek Site Tour & AGM

Share
Bardavcol Site Office
Add to calendar
 

Event description

Breakout Creek is being steadily transformed from an artificial channel into a more natural and healthy river system. The Stage 3 redevelopment area stretches from Tapleys Hill Road to the sea, a total of 1.5 kilometres of river and banks.

Stage 3 will create wetlands to capture and clean stormwater from adjacent residential catchments prior to discharge to the river, remove weeds, plant more than 215,000 new native plants and create habitat for a range of aquatic and terrestrial fauna. The redevelopment will also open areas that are currently fenced off, with new opportunities for people to enjoy trails, picnic areas, viewing decks and art.

The AGM will follow at the Beachside Restaurant (5 West Beach Road, West Beach), with drinks and nibbles provided. The new committee for 2022/2023 will be nominated at the AGM.

A hard hat, eye protection, high visibility vest, long pants and sleeves and safety boots are required for entry.

Parking:

  • Limited parking is available within Bardavcol’s site car park, entry off Fawnbrake Crescent.
  • There should be adequate on-street overflow parking within 5–10 minutes walk of the site compound.
  • Attendees should avoid parking in Fawnbrake Crescent near the site compound access, as it is narrow.
Powered by

Tickets for good, not greed Humanitix dedicates 100% of profits from booking fees to charity

This event has passed
This event has passed
Bardavcol Site Office
Host icon
Hosted by Stormwater SA