More dates

Payment plans available!

How payment plans work

  • Your order will be reserved but sent to you only after the full payment plan has been completed.
  • A minimum upfront payment is required to secure your order. This includes a surcharge, a non-refundable cancellation fee, and a refundable deposit.
  • You’ll receive a notification before each payment attempt. You must ensure sufficient funds are available.

Site Tour | Seqwater - Mt Crosby Water Treatment Plant

Share
Mount Crosby Westbank WTP
Chuwar QLD, Australia
Add to calendar
 

Event description

Host Site: 

    Seqwater
    Website

Industry Partners Australia is proud to organise a site tour of Seqwater Mt Crosby Water Treatment Plant.

The Mt Crosby West Bank Water Treatment Plant (WTP) turns raw water into safe, drinkable water for the Brisbane and Ipswich area.

Two water treatment plants are located at Mt Crosby – East Bank and West Bank. Combined, the plants can produce up to 1000 megalitres of drinking water per day.

Untreated water collected at the Mt Crosby Weir is pumped into the WTP at the same level as the bottom of the Brisbane River.

Three pumps are located in pump wells 34 metres deep, each with the capacity to pump 125 million litres per day. Only two of these pumps operate at one time.

All water treated must adhere to the stringent Australian Drinking Water Quality Guidelines. The basic water treatment processes include coagulation, flocculation, sedimentation, filtration and lastly, disinfection of water.

For most of us in the Greater Brisbane and Ipswich areas, every time we drink a glass of water from the tap, it is likely that the water came from this facility.

This Site Tour will bring together businesses that have an interest in seeing how one of our major public assets operates.

Don’t miss this fantastic opportunity to share with and learn from other businesses within your network.

FACT SHEET - MT CROSBY WTP

Agenda:
1:30:  Arrival and registration
2:00:  Introduction to Mt Crosby Water Treatment Plant
2:30:  Site Tour
3:15:  Return to office
3:30:  Event close

Who should attend?

This event is ideal for Maintenance and Reliability Managers, Engineering Managers, Water treatment plant operators.
As a member of IPA you can register up to 2 people, subject to availability, to attend this event.
This event is for IPA members only, there will be no public access to this event. 

When do I need to register by?
Registrations close 3 days prior to event date. 
Registrations are based on a "first come, first served" basis. 
There are no allocated seats with membership.

PPE Requirements:

  • Long sleeve shirts – (hi-vis if possible)
  • Long pants
  • Fully enclosed flat shoes
  • Hat (wide-brimmed)
  • Water bottle
  • Seqwater will provide hi-vis vests and safety glasses

Who can I contact for further information? 

     
     
Samantha Jeffrey | National Engagement & Event Manager
     samantha@industrypartners.com.au 
     0438 058 823  

Powered by

Tickets for good, not greed Humanitix dedicates 100% of profits from booking fees to charity

This event has passed
Register
This event has passed
Register
Mount Crosby Westbank WTP
Chuwar QLD, Australia